PARKER PROCESSING VIET NAM CO., LTD PARKER PROCESSING VIET NAM CO., LTD
Tiếng Việt日本語English

Installation a rooftop solar power system

Date created: 24/11/2023
Aiming to build an environmentally friendly manufacturing factory, PPV started installing a rooftop solar power system in Semtember 2022. The rooftop solar power system has been officially operational since January 2023. The electricity generated from solar pins connecting to the grid electricity is no small contribution to the goals of saving energy and reducing the greenhouse gas emissions in Hanoi’s industries.